ADVERTISEMENT
  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Advertise Here
  • Login
National Insight News
Advertisement
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Health
  • Tourism
No Result
View All Result
  • News
  • Politics
  • Business
  • Entertainment
  • Sports
  • Health
  • Tourism
No Result
View All Result
National Insight
No Result
View All Result
Home Featured

Kwara Orders Road Contractor Back To Site Over Alleged Shoddy Job

by NationalInsight
October 19, 2022
in Featured, News
Reading Time: 2min read
0
1
SHARES
487
VIEWS
Share on FacebookShare on TwitterShare on WhatsApp

The Kwara State Government has threatened to order the consultant and the contractor that constructed the N3.7 billion Diamond Underpass flyover in Ilorin to site over a failed portion of the project.

https://aouniversity.edu.ng/ https://aouniversity.edu.ng/ https://aouniversity.edu.ng/

The flyover, located at the entry point of the state capital, was constructed and commissioned by the immediate past administration in the state in its twilight.

You might also like

Ibadan Metaphor of Power, Powerlessness, and UI’s Missteps By Taiwo Adisa

Nigerian Football Legend Henry Nwosu, 1980 AFCON Winner, Dies at 62

Oyo Coalition Launches ‘JDS Renewed Hope Movement’, Endorses Tinubu for Second Term

Load More

Speaking with journalists when he inspected the failed portion of the project, the state’s Commissioner for Works, Rotimi Ilyasu, said that the state government would also explore what it could get back from those concerned.

“There are many projects like that. This is a job that was initially awarded at N2.5 billion and rose to N3.7 billion. The contract passed through the Executive Council, it approved it and gave the contractor an approval. And those that did that did it on behalf of Kwarans,” he said.

The commissioner, who said that the state government would repair the bad road as part of its responsibility in power, adding that the repair would remove the sufferings of the people plying the road.

“Government has everything to lose when we pursue a legal option. People will suffer effects of bad roads. So, we look at how to mediate by calling the contractor back to site as well as the consultant on this job to ensure proper work was done. But in the interim we have to do what we are supposed to do. That’s why we brought in stone base materials. We will also do some other bad sections of the road where asphalt has cracked. Compaction was not properly done, because it was a rushed job due to the intention to hurriedly commission it.

“The present administration has a lot of job to be commissioned right now. But we are not rushing. We have to give Kwarans the best. We will make sure we complete the jobs to standard before we do commissioning or else we will end up wasting fund. We’re learning from this also,” he said.

ALSO READ  3,195 Enrolled As Kwara's Digital Training Programme Begins

The commissioner, who said that the project was not certified by the state ministry, added that materials used to construct the road were not adequate and that the development resulted in quick failure of the road.

author avatar
NationalInsight
See Full Bio
Tags: Kwara stateRotimi Ilyasu
Share16Tweet10Send
Previous Post

ASUU Set To Address Court Cases, Demands, Others After Suspending Strike

Next Post

Undergraduates In Diaspora : FG Set To Review NYSC Act

NationalInsight

NationalInsight

Related Posts

His Imperial Majesty Oba Rasidi Adewolu Ladoja Arusa1 The Ollubadan of Ibadanland
Featured

Ibadan Metaphor of Power, Powerlessness, and UI’s Missteps By Taiwo Adisa

by NationalInsight
March 15, 2026
115
#image_title
Featured

Nigerian Football Legend Henry Nwosu, 1980 AFCON Winner, Dies at 62

by NationalInsight
March 14, 2026
117
#image_title
Featured

Oyo Coalition Launches ‘JDS Renewed Hope Movement’, Endorses Tinubu for Second Term

by NationalInsight
March 14, 2026
455
#image_title
News

A Tree Growing Under Another Tree Cannot Flourish to Become a Big Tree By Tunji Ajibade

by NationalInsight
March 14, 2026
208
#image_title
Featured

Akpabio Inaugurates APC Convention Sub-Committee on Programmes, Events

by NationalInsight
March 13, 2026
122
Next Post
11 NYSC CORPS MEMBERS

Undergraduates In Diaspora : FG Set To Review NYSC Act

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Latest Post

His Imperial Majesty Oba Rasidi Adewolu Ladoja Arusa1 The Ollubadan of Ibadanland

Ibadan Metaphor of Power, Powerlessness, and UI’s Missteps By Taiwo Adisa

March 15, 2026
115
#image_title

Nigerian Football Legend Henry Nwosu, 1980 AFCON Winner, Dies at 62

March 14, 2026
117
#image_title

Oyo Coalition Launches ‘JDS Renewed Hope Movement’, Endorses Tinubu for Second Term

March 14, 2026
455
  • Home
  • About Us
  • Contact Us
  • Privacy Policy
  • Advertise Here

Recent Posts

  • Ibadan Metaphor of Power, Powerlessness, and UI’s Missteps By Taiwo Adisa
  • Nigerian Football Legend Henry Nwosu, 1980 AFCON Winner, Dies at 62
  • Oyo Coalition Launches ‘JDS Renewed Hope Movement’, Endorses Tinubu for Second Term

Copyright © 2020 National Insight News

No Result
View All Result
  • Politics
  • Entertainment
  • News
    • Business
    • Health
    • Tourism
  • Sports
  • Contact Us
  • Privacy Policy

Copyright © 2020 National Insight News

Welcome Back!

Login to your account below

Forgotten Password?

Create New Account!

Fill the forms bellow to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
WP Twitter Auto Publish Powered By : XYZScripts.com